Project
A Victorian terrace, repiped in copper
Lead and steel pipework replaced throughout while the family stayed at home.
Location
Mill Lane, Ashby
Year
2026
Time on site
9 days
Service
Plumbing

Before

After
The house
A three-storey terrace from 1894 with the original lead supply and a patchwork of steel and plastic added over a century.
What we did
We replaced the incoming main and repiped floor by floor, keeping one bathroom working at all times. Every joint was pressure-tested and photographed before the floors went back.
The result
Water pressure at the top floor doubled, and the owners have a photo record of every pipe in the house.
Lines open now
Leaking, cold or tripping? Call us, or book a visit for this week.
24/7 emergency line
